This job board retrieves part of its jobs from: Norman Jobs | Electrician Jobs | Florida Jobs

Find jobs in Arizona today!

To post a job, login or create an account |  Post a Job

  Jobs in Arizona  

Bringing the best, highest paying job offers near you

Slide 1
Slide 2
Slide 3
previous arrow
next arrow

Construction Scheduling Manager

Lennar Homes

This is a Full-time position in Phoenix, AZ posted July 20, 2021.

Overview
POSITION SUMMARY:

Construction Scheduling Manager is responsible for proactive management of field schedules in BuildPro™ to reduce cycle time, increase accuracy in completion dates and lower construction costs
Responsibilities
ESSENTIAL DUTIES AND RESPONSIBILITIES:
Ability to effectively manage 200+ homes under construction using Build Pro™ to schedule.

Independently analyze construction managers’ field audits to ensure accuracy of data within Build Pro™.

Identify trade partner non-performance and provide solutions for proper load balancing of their work.

Provide reporting metrics addressing performance of 50+ trade partners across communities Provide real-time scheduling guidance and communicate via Build Pro/Supply Pro™ to trade partners and construction team Develop procedures for documenting and reporting delays Monitor BuildPro™ for missing cost codes, MPOs, trade info pull through, clearing of alerts and payment issues.

Acts as a liaison between Permit Coordinator, Purchasing, Construction and Build Pro support Level 2.

Provide feedback on scheduling templates to Level 2 support to ensure construction managers and trade partners have the best experience possible using Build Pro/Supply Pro.™ Coordinate and monitor construction activities and resource allocation to ensure profitability of projects Make recommendations on resource procurement to Director of Construction and Purchasing.

Provide division leadership with Build Pro™ reporting on trade partner performance to assist in the decisions on vendor contract renewals.

Responsible for the daily management of at least two Purchasing Expeditors including distribution of work, performance management and hiring/termination decisions Lead, coach, mentor and manage individuals and team to ensure top performance of all team members in achieving desired results while finding efficient and effective solutions that create overall organizational value Qualifications
EDUCATION AND ADDITIONAL REQUIREMENTS:
Minimum six (6) years of experience in construction industry required Minimum high school diploma or equivalent required, some college preferred Must have had experience as a construction manager or equivalent job Must possess professional attitude to represent the company in a positive manner Valid Driver’s License with good driving record Valid Auto insurance coverage Advanced PC skills Microsoft Word, Excel, and JD Edwards Excellent follow-up, communication (written and verbal) and time management skills Able to simultaneously perform multiple detail-oriented tasks with little oversight

PHYSICAL REQUIREMENTS:

This is primarily a sedentary office position which requires the ability to occasionally bend, stoop, reach, lift, move and carry office supplies weighing 25 pounds or less.

Finger dexterity is required to operate computer keyboard, calculator, and telephone equipment.

#cb